Skip to main content

COATINGS & SPORTS SURFACES

Acrylics

Originally conceived mainly for the protection of waterproofing resins, the coatings have become over the years real alternative solutions to traditional flooring and structure protection systems.

Floorgum Antracite

Description

  • The product

    Water-based synthetic underlay, single-component with granular inert fillers. It creates an elastic, shock-absorbing layer for multi-purpose sports fields.

  • Where and how to use it

    It is used as an intermediate layer in sports systems, on compatible asphalt or concrete substrates, indoors and outdoors. It pairs with the finishes provided by the system.

  • General information
    • Consumption: 1.5 kg/m² in two coats.
    • Bucket of 20 kg.
    • Indicative drying time: 4 hours at 23 °C and 50% R.H.

    Consumption and times vary with the substrate and environmental conditions. Consult the technical data sheet for the full cycle.

Floorgum Antracite

Sportgum

Description

  • The product

    Liquid synthetic underlay with water-based resins and granular aggregates. It forms an elastic surface capable of cushioning impacts in multi-purpose fields.

  • Where and how to use it

    Suitable for indoor and outdoor fields, as an underlay of compatible sports systems. It is spread with a notched trowel and completed with the finish of the cycle.

  • General information
    • Consumption: 0.8 L/m² per mm, with a minimum thickness of 2 mm.
    • Bucket of 25 L.
    • Indicative drying time: 4 hours at 23 °C and 50% R.H.

    Consumption and times vary with the substrate and environmental conditions. Consult the technical data sheet for the full cycle.

Sportgum

Floorgum Paint

Description

  • The product

    Multi-use walkable coating with water-based resins. It creates a continuous, non-slip surface, resistant to wear and weathering.

  • Where and how to use it

    Usable on compatible waterproofing systems, multi-purpose fields, cycle paths and pedestrian areas. It is suitable for concrete or bituminous substrates prepared according to the cycle.

  • General information
    • Consumption: 1,2 kg/m².
    • Bucket of 20 kg.
    • The technical data sheet indicates 4 hours of drying and walkability after 12 hours, at 23 °C and 50% R.H.

    Consumption and times vary with the substrate and environmental conditions. Consult the technical data sheet for the full cycle.

Floorgum Paint

Environmental protocols

  • LEED® v4 BD+C and ID+C

    LEED® (Leadership in Energy and Environmental Design) is the international building sustainability certification system. The table indicates the credits the product can contribute to: ✓ contributes, – does not contribute, n.a. not applicable.

    LEED v4 BD+C and ID+C
    SSc Heat Island Reduction – Option1 –
    MRc BPDO – EPD Option1 ✓
    MRc BPDO
    Sourcing of Raw Materials – Option 2
    –
    MRc BPDO
    Material Ingredients – Option 2
    ✓
    EQc Low – Emitting materials –
  • LEED® v4.1 BD+C and ID+C
    LEED v4.1 BD+C and ID+C
    SSc Heat Island Reduction – Option 1 –
    MRc EPD – Option1 ✓
    MRc Sourcing of Raw Materials –
    MRc Material Ingredients Option 2 ✓
    EQc Low – Emitting materials –
  • WELL® v2

    WELL® v2 is the standard that assesses the effect of buildings on people’s health and wellbeing. The table reports the material requirements (restricted substances, VOCs) met by the product.

    WELL v2
    X01.1 Material Restrictions
    Restrict Asbestos
    ✓
    X02.1 Interior Hazardous Materials Management
    Manage Asbestos Hazards
    –
    X01.3 Material Restrictions
    Restrict Lead
    ✓
    X05.2 Enhanced Material Restrictions
    Part 2 Select Compliant Architectural
    And Interior Product
    –
    X06 VOC Restrictions –
    X08.1 Materials Optimization – Select Materials With Enhanced Chemical Restrictions option 1 ✓
  • BREEAM® International NC v6.0

    BREEAM® is the international method for assessing building sustainability. The table reports the credits related to materials and indoor air quality.

    BREEAM International NC v6.0
    Mat 01 – Life cycle impacts EPD
    Mat03 – Responsable sourcing of materials ISO 14001
    Hea 02 – Indoor Air Quality –
  • CAM® Building 06/08/2022

    The Minimum Environmental Criteria (CAM) are the mandatory environmental requirements in Italian public procurement. The table reports the CAM Building (06/08/2022) criteria concerning the product.

    CAM Building 06/08/2022
    2.5.1 Emissions in enclosed environments (indoor pollution) –
    2.5.6 Wood products n.a.
    2.5.7 Thermal and acoustic insulators n.a.
    2.5.13 Paints and varnishes Provide test report

Download environmental protocols

Certifications

Colorflex

Description

  • The product

    Coloured acrylic water-based finish, formulated to resist mechanical wear and weathering. It allows defining the playing areas in Sport Flooring systems.

  • Where and how to use it

    It is used indoors and outdoors for demarcations and compatible sports coatings. Application with a roller or brush.

  • General information
    • Consumption: 1 kg/m², or 0.05 kg per metre of 50 mm wide line.
    • Bucket of 5 kg.
    • Drying: about 4 hours at 23 °C and 50% R.H.

    Consumption and times vary with the substrate and environmental conditions. Consult the technical data sheet for the full cycle.

Colorflex

Floorgum Tyre Mono

Description

  • The product

    Single-component low-thickness drive-on coating. It protects internal and external surfaces subject to traffic and wear, with resistance to weathering and UV rays.

  • Where and how to use it

    Suitable for garages, car parks, yards and concrete floors. It can complete compatible waterproofing systems.

  • General information
    • Consumption: 1 kg/m² in two coats.
    • Bucket of 20 kg.
    • At 23 °C and 50% R.H.: drying 4 hours, walkability 12 hours, driveability after 4 days.

    Consumption and times vary with the substrate and environmental conditions. Consult the technical data sheet for the full cycle.

Floorgum Tyre Mono

Epoxy coatings

Formulated with two-component epoxy resins of extremely high chemical and physical resistance, they create uniform, low-thickness finishes for a wide range of technical surfaces. They are the solution for drive-on flooring, coloured finishes for swimming pools and containment tanks, offering suitability for direct contact with food substances and liquids. Their durability ensures protection and consistent performance for both sports and industrial uses.

Epofill Kit

Description

  • The product

    Two-component water-based epoxy filler, specifically for levelling and repairing industrial floors and cementitious surfaces. Thanks to its high filling capacity, it allows targeted and effective interventions even at high thicknesses, restoring the flatness and continuity of the substrate.

  • Where and how to use it

    It is applied with a trowel to seal and level cracks, fissures and cavities in the substrate. The two components, supplied in pre-dosed amounts, must be mixed carefully following the proportions and instructions given in the technical data sheet.

  • General information
    • Kit of 5 kg.
    • Consumption depending on the repair.
    • Workability time: about 1 hour.
    • Drying: about 24 hours at 20 °C and 40% R.H.

    Yield, actual consumption and curing times depend on the substrate and the microclimatic conditions at the time of laying. To ensure the intervention is carried out correctly, please refer to the technical data sheet of the full system.

Epofill Kit

Epokoat Vernice Epossidica

Description

  • The product

    Coloured two-component epoxy paint formulated to create continuous, joint-free coatings. It provides high mechanical and chemical resistance, offering a perfectly washable, hygienic surface ideal for protecting floors and surfaces in internal industrial environments.

  • Where and how to use it

    Ideal for application on floors and walls, even in high mechanical stress environments subject to forklift traffic. It is easily applied with a roller or brush on substrates properly prepared according to the application system specifications.

  • General information
    • Consumption: 0.30 kg/m² in two coats.
    • Kit A+B of 5.75 kg.
    • At 23 °C and 50% R.H.: drying 24 hours, driveability after 7 days.

    The volumes used and the drying times are strictly linked to the nature of the surface and the environmental parameters. For detailed instructions on the application system, please refer to the technical data sheet.

Epokoat Vernice Epossidica

Ecoreflex

Description

  • The product

    High-tech white water-based protective coating with ultra-reflective and photocatalytic properties. It reduces heat build-up and surface temperature, helping to mitigate the urban heat island effect, while the photocatalytic action promotes the decomposition of dirt, ensuring a constant self-cleaning effect over time.

  • Where and how to use it

    Suitable for the protection and thermal regulation of roofs and horizontal, vertical or sloped surfaces, including compatible bituminous membranes. It is applied with a brush, roller or airless system, strictly following the instructions given in the technical data sheet.

  • General information
    • Consumption: 1 kg/m² in two coats.
    • Buckets of 5 and 20 kg.
    • Drying: about 5 hours at 23 °C and 50% R.H.

    The absorbency of the surface and the environmental factors on site may vary actual consumption and drying times. For correct application and to consult the full system, please refer to the technical data sheet.

Ecoreflex

Download